Corrugated cardboard manufacturing and cardboard box production in large quantities

WELCOME TO EMSBÜREN.
HOME OF THE SMART BOX!

You may already know this: Packners is one of the most modern corrugated board processors in the world as we know it. This was true even for our first site in Schüttorf. Fortunately, we’ve been on a steady growth trajectory ever since, which led us to relocate to our brand-new Packners facility in Emsbüren at the end of 2023. And our new location—just 3 km as the crow flies from the old one—is truly impressive: On a 110,000 m² plot, we’ve built 40,000 m² of production and logistics space that sets new standards.

While our machinery is relatively young compared to industry standards, we continuously invest in new equipment that not only improves efficiency but also expands capabilities. This allows us to nearly double our production capacity for corrugated folding boxes while significantly broadening our product range. Needless to say, all production steps are fully automated. With our new facility, we now also produce Packners-made corrugated board, thanks to our state-of-the-art corrugating line. This cutting-edge system supplies our five production lines with single- or double-wall corrugated board in various designs—just in time.

Did you know? Our new Packners facility represents an €80 million+ investment, features a 40-meter-high high-bay warehouse (visible from afar!), and harnesses 2.3 MWp of solar power to meet a major share of our energy demand.

Production volume

Designed for large production volumes of folding boxes and die-cut packaging

Flexoprint

Printing with up to five colors and varnish using the flexographic printing process

Corrugator

Corrugated board production line for single/double-wall corrugated board: Year built 2023, capacity up to 450 meters per minute or 250-300 million m² annually

Machinery park

State-of-the-art machinery: Five production lines (built between 2017 and 2023): Three inliners, one rotary die cutter, and one folding and gluing machine

Production Capacities

Inliner up to 24,000 / 36,000 cartons per hour, rotary die cutter up to 12,000 inserts per hour

Pallet storage capacity

High-bay warehouse with capacity for approximately 36,500 pallets

Intralogistics

3.5 km of conveyor technology connects all production areas seamlessly and fully automatically to the loading ramp.

Loading & shipping

Seven loading docks currently in operation, with seven additional docks already prepared

Team

around 120 fantatstic people

Where it all began

Schüttorf

The success story of the “smart box” began in Schüttorf in 2010 with a high-performance plant for large quantities: till 2023, up to 30,000 transport and shipping cartons per hour were being produced on a single line here.

With two inline machines and one rotary die cutter, we produced enough volume here to dispatch up to 60 trucks per day from our premises. The high-bay warehouse was highly visible from the A31/A30 motorway interchange, and the conveyor bridge to our neighbor for just-in-time corrugated board supply was a key advantage for us.

Außenansicht Packners-Gebäude mit großem Logo an der Fassade bei blauem Himmel.

Enough talk:

Take a look at the image video (German audio with English subtitles) and hopefully you will be convinced that we are the right partner for you, whether you need folding, die-cut or other boxes made of corrugated cardboard, even in large quantities.

Fly with us over and through our new factory: high-tech at its finest. Computers and robots and people with heart, mind, and empathy. And mountains of corrugated cardboard and corrugated cardboard boxes.

Welcome to PACKNERS in Emsbüren, home of the “kluge Kiste” (meaning “smart box”). Click HERE to watch our image video with Dutch subtitles.

Welcome to PACKNERS in Emsbüren (Germany), home of the “kluge Kiste” (the “smart box”). Klick HERE for our imagevideo, with English subtitles.

HOW TO GET TO EMSBÜREN …

These directions will guide you to the reserved visitor parking lot on site. Since we have literally built our new plant on a greenfield site, the official signage in the area may still be somewhat sparse. You can already find us on Google Maps, but despite any recommendations for idyllic country roads, you should use the Emsbüren exit from the A31.

P.S.: If your electric vehicle needs charging during your visit, we have a charging station available for you.

Take the Emsbüren exit on the A31 and follow the signs to the Emslandpark Ost industrial park, drive along Mendelstraße parallel to the highway, and then turn left onto Lise-Meitner-Straße. Banners at the side of the road will show you the way. You can find our factory on Google Maps.

Before you can drive onto our factory premises, you must first register digitally at www.LKWRUF.de/packners or scan the QR code on site.

You can find us in the new industrial park “Emslandpark-Ost”, at the A30/A31 motorway interchange. Until the end of 2023, our factory was located in nearby Schüttorf for many years, clearly visible directly on the highway—just so you’re not confused.

Lise-Meitner-Straße 7-11

D – 48488 Emsbüren

Außenansicht des Packners Firmengebäudes mit Haupteingang
The construction site in fast motion

Review

In fast motion (more precisely: 2.5 years in 1:20 minutes), our new plant in Emsbüren is growing skyward.

From the very first groundbreaking in September 2022, you have a front-row seat to the birth of the new home of the ‘smart box.’ A masterclass in construction cinema at its finest.